PAINT AND PAPER

From fixing a dripping tap to installing a water softener or a shower installation, plumbing requires not just skill but a vision to determine where pipes can be run to overcome obstacles in the home such as joists and walls. We strive where possible to hide our work and always give consideration to any future maintenance requirements through the use of appropriately placed isolation valves and drain off points.


Fancy a water softener and want to know more? - Feel free to contact Lemontrade for a no obligation chat and estimate.  

 

CHECK OUT SOME OF OUR RECENT PROJECTS

 

WATER SOFTENERS

The job was no easy feat. There was a lot of shoddy work left over from the original construction which had to be either modified or replaced. The goal was to secure the structural integrity while also adding a contemporary style. With careful planning, preparation, and execution, you can see the unique and wonderful finished product.

SHOWER &  BATH

New pipework to make way for a shower over existing bath. Full bore isolation valves are used to ensure maximum flow rates are achieved at the shower head. Note too pipes buried in wall are protected from corrosion by inserting in plastic conduit.

WORK IN PROGRESS

...

 

01728 417817

Registered Office: 5 Station Yard, Needham Market, Stowmarket IP6 8AS, UK

Terms & Conditions

Cookie Policy

Privacy Policy

©2019 by Lemontrade Group Ltd. Proudly created with Wix.com